The Commission while considering proposals relating to flyovers has been stressing for traffic improvement schemes for important traffic corridors. As large number of flyovers are planned/under construction the Commission felt the need for taking up a study relating to the impact of the flyovers on the traffic scenario. In the fist instance it was decided to take up a part of the Ring Road stretch for the study.
The objectives of the study were :
- To assess responsiveness of flyover configuration with needs of various categories of traffic.
- To evaluate traffic operations on and around the grade separated facility.
- To perform critical review of geometric design aspects in the vicinity of the flyover.
- To suggest ways and means for improving the traffic flow.
|